QA & Validation

A defined evidence path from requirement intake to technical review, sample validation, supply confirmation and delivery follow-up.

Evidence · Specification · Compatibility · Supply · Delivery
Requirement EvidencePN/BOM, platform, rate, reach, quantity and timing.
Technical ReviewForm factor, optical type, connector and topology context.
Validation PathSample / platform validation when required.
Commercial ConfirmationCurrent supply, lead time and delivery conditions.

Six gates before a volume commitment

The exact scope depends on the product and project. The objective is to separate known facts from assumptions before the customer commits.

01 / INTAKERequirement EvidencePN/BOM or platform, rate, reach, connector, quantity and date.
02 / IDENTITYProduct ConsistencyPN, label, specification and requested configuration are cross-checked.
03 / TECHNICALLink ReviewForm factor, protocol, FEC context, fiber, connector and topology.
04 / SAMPLEValidation PathSample / interoperability validation is coordinated when required.
05 / COMMERCIALSupply ConfirmationAvailability, quantity, allocation and lead time are confirmed for the RFQ.
06 / DELIVERYShipment Follow-UpPackaging, shipment communication and post-delivery issue coordination.

Professional trust depends on clear boundaries

QIANWU only presents what can be documented or confirmed for the actual project.

What QIANWU can coordinate and document

  • Requirement and PN/BOM intake
  • Specification and configuration review
  • Platform / form-factor / connector context
  • Sample and validation communication
  • Current supply, quantity and lead-time confirmation
  • Shipment and project follow-up

What still requires exact project confirmation

  • Final compatibility with the target switch / NIC / DPU and firmware
  • Final FEC, lane mapping and platform-specific behavior
  • Final optical loss budget and cabling implementation
  • Any third-party certification or test result not explicitly documented
  • Binding capacity, allocation and delivery date before commercial confirmation
  • Performance outside the exact validated configuration
Ownership boundary: validation may be coordinated through qualified technical and supply-chain resources. QIANWU does not represent third-party factories, laboratories or facilities as company-owned unless that ownership can be independently documented.

What customers can send to accelerate validation

01 / PLATFORM

Host Details

Switch, NIC / HCA / DPU, server platform and port form factor.

Exact model is preferred.
02 / LINK

Network Requirement

Protocol, rate, native or breakout mode, reach and topology.

Ethernet / InfiniBand context.
03 / MEDIA

Fiber / Cable

Fiber type, connector, patch path and cable length when known.

MPO / LC / AOC / DAC.
04 / COMMERCIAL

Quantity & Timing

Sample quantity, volume quantity and target delivery date.

Required for supply feasibility.

Have a platform, PN/BOM or validation requirement?

Send the evidence available today. Missing inputs can be identified during review.

Validate an AI cluster link before scale

Use the AI cluster checklist to freeze platform, port mode, optics, fiber, firmware/FEC and test evidence.